
From your concept and sketch to dispatch, every stage of a KOCO order, done by hand with zero electricity.
A KOCO order moves through five hand-only stages: concept scoping, written pattern creation, an individual tension swatch, hand-knitting by one artisan, and hand-finishing. No machine touches the garment at any stage, and the same artisan knits it from first stitch to last.
Production begins when a brand sends an image or sketch. KOCO scopes it for stitch count, yarn yield and feasibility, then writes a separate written pattern for each size. KOCO provides every knitter with a detailed written pattern, often running to 50 pages or more for each size. In conventional hand-knit production, individual knitters are generally not given written patterns. A KOCO pattern has no abbreviations, so a knitter can follow it line by line.
Before any garment is knitted, the assigned artisan knits an individual tension swatch to check tension/gauge against the written pattern. The garment is then knitted by that one artisan, on bamboo and timber needles, from first stitch to last. Joining and finishing are all done by hand. There is no linking machine, no steam press, no power tool.
Lead times reflect the method, not a machine schedule. A hand-knit garment takes longer than a machine-knitted one because every stitch is placed by a person. We quote a realistic lead time at scoping and hold to it, because the constraint is artisan hours, not machine capacity.
| Stage | What is used | Who does it |
|---|---|---|
| 1. Tech pack scoping | Tech pack or sketch, reviewed by hand | KOCO pattern team |
| 2. Pattern writing | Written pattern, 50+ pages per size, no abbreviations | KOCO pattern team |
| 3. Tension swatch | Bamboo or timber needles, yarn to spec | The assigned artisan |
| 4. Hand knitting | Bamboo and timber needles, zero electricity | One artisan, first stitch to last |
| 5. Finishing and dispatch | Hand-joining and hand-finishing | The same artisan, then checked before dispatch |
Because one artisan knits each garment from start to finish, consistency comes from the written pattern and the tension swatch, not from a machine setting. That is what lets a run of hundreds hold the same tension/gauge as a single prototype.
If your timeline assumes machine throughput, it will not fit hand-knit production. Bring us in at the design stage and we will scope a realistic lead time against your collection calendar.
It depends on stitch complexity, garment type and order size. We quote a specific lead time at scoping once we have seen the tech pack. The constraint is artisan hours, so a complex cable garment in a run of 200 takes longer than a simple stockinette piece in a run of 20.
Yes. Send the sample or the tech pack. We write the pattern from it, knit a tension swatch, and produce a prototype for your sign-off before bulk knitting begins.
Each garment is knitted from first stitch to last by a single artisan. In a run, the written pattern and tension swatch hold consistency across artisans, and each piece is traceable to the one maker who completed it.
An image or sketch is all we need to start. We will come back with feasibility, indicative costing and lead times for your hand-knit project.